Saturday, May 18, 2013

Industrial Engineering


Objective of the site:          


Entire program is design to extract the system deficiencies lies with “S-Suhi Industrial Park Ltd.” in terms of productivity and technological concepts.

  1. Educate technical staff and management on possible improvements that can be take place in the technical system.
  2. Introduce basic fundamental industrial engineering concepts to technical staff in order to emphasize on the impotency of following such systems in the industry.
  3. By identifying the needs for improvement and based on the findings giving the recommendations to the management.
Areas to be covered by the system analyze;
Ø  Present technical operational system
Ø  Positive and negative impacts
Ø  Present opportunity Gaps
Ø  Possibility of improvements
Ø  System sustainability

Methodology


Methodology has been defined to analyze actual present scenario of “S-Suhi Industrial Park Ltd.” and to find out opportunity Gap and emphasize on possibilities of improvement.

·         Evaluating the historical Data
·         Evaluating the current performances
·         System Gap Evaluation;
o   Systems
o   Activities
o   Procedures
·         Opportunity Gap analysis has done in terms of;
o   Capacity Gap
o   Utilization Gap
o   Methods Gap
o   Quality Gap
o   Human resource Gap
·         Training module.
o   On job practical session to provide evidence of  possible improvements
o   Educate staff on industrial engineering and productivity improvement basic principles and past and present knowledge capacity improvements

This is the basic part of my site:

I will discuss Briefly about bellow Subject:

1. Planning 
2. Supply chain management 
3. Report Oriented development
4. Productivity and Efficiency impoverishment
5. Target and result oriented output     






























No comments:

Post a Comment