Objective
of the site:
Entire program is design to extract the system
deficiencies lies with “S-Suhi Industrial Park Ltd.” in terms of productivity
and technological concepts.
- Educate technical staff and management on possible improvements that can be take place in the technical system.
- Introduce basic fundamental industrial engineering concepts to technical staff in order to emphasize on the impotency of following such systems in the industry.
- By identifying the needs for improvement and based on the findings giving the recommendations to the management.
Ø
Present technical operational system
Ø
Positive and negative impacts
Ø
Present opportunity Gaps
Ø
Possibility of improvements
Ø
System sustainability
Methodology
Methodology has been defined to analyze actual present
scenario of “S-Suhi Industrial Park Ltd.”
and to find out opportunity Gap and emphasize on possibilities of improvement.
·
Evaluating the historical Data
·
Evaluating the current performances
·
System Gap Evaluation;
o
Systems
o
Activities
o
Procedures
·
Opportunity Gap analysis has done in terms of;
o
Capacity Gap
o
Utilization Gap
o
Methods Gap
o
Quality Gap
o
Human resource Gap
·
Training module.
o
On job practical session to provide evidence
of possible improvements
o
Educate staff on industrial engineering and
productivity improvement basic principles and past and present knowledge
capacity improvements
I will discuss Briefly about bellow Subject:
1. Planning
2. Supply chain management
3. Report Oriented development
4. Productivity and Efficiency impoverishment
5. Target and result oriented output
No comments:
Post a Comment